Site Installation Process Of Container House Home > Container Building & Mobile House
Site Installation Process Of Container House
  • Site Installation Process Of Container House

Site Installation Process Of Container House

Item No.: P0017
HL is a professional container house supplier in China. HL has the detailed and professional site installation process.
INQUIRY
Site installation process

1. Site plan positioning
2. Base positioning
3. The hoisting of building modules
4. The positioning installation of A module
5. The diagram form of the building module connecting to the base
6. The A module aligns B module with the left side of A module as a benchmark.
7. The seaming procedure of A module and B module.

 
1.Confirm the land area and planning the outside environment.
2.Confirm the size of modules and leave the adjustable range.
3.Confirm the location of the base and position the construction foundation.
Pay attention: building location and base location should positioned precisely. avoiding the follow-up construction.
1.According to the base size, set up the base.
2.The levelness, verticality, and dimensions should be examined in the course of setting up the base.
3.Reconfirmation for the base.
Pay attention:
The base should be horizontal vertical and have reasonable force. The dimensions should meet the use requirements.

1.After the arrival of building modules, users should check the damages during transports and record repairing.
2.When hoisting the building modules, the four corners of building module should under the same stress and lifted at the same time. F1=F2=F3=F4
Pay attention: The building module should rise and fall smoothly  and steadily.
1.Confirm the base horizontal vertical, and prepare to place the A module.
2.Confirm the location of A module and mark the horizontal line.
3.Place the A module steadily and make the A module fit to the dimension of the base.
Pay attention:
Ensure the base horizontal vertical. Ensure the position line of A module accurate.

1.The modules and base are fixed with anchor bolt or container lock.
2.The anchor bolt is placed according to the dimensions of A module. The size and location of anchor bolt should meet the use requirements.
3.The module should fall vertically and the anchor bolt in the base should be enfolded within the corner fittings.
1.After locating the A module accurately, the B module should be placed steadily, whose processes are same with the A module.
2.The B module should be placed in the horizontal vertical level as the benchmark of the A module, making A module and B module reach the entirely horizontal vertical level.
3.Anchor A module and B module.


1.If A module and B module reach the entirely horizontal vertical level, there will be a smooth seam.
2.The polystyrene board waterproof insulation board is filled in the seam. And preservative-treated timber or other materials are used to make up the cover with waterproof treatment.
3.The materials in the seam and the seal are dealt with waterproof glue.