|
Industry News Home > News > Industry News

Heavy news! State Department re-issued the text, promoting prefabricated building and steel construction!

November 5, Premier Li Keqiang signed the text to clarify the main objectives and priorities of the "13th Five-Year" energy-saving emission reduction work and make the comprehensive arrangement for the national energy-saving and emission reduction work.
 
In the aspect of strengthening building energy conservation:
To implement advanced standards for building energy conversation
To carry out pilot projects of building ultra-low and near-zero energy consumption construction
To promote distributed photovoltaic power generation on the rooftop of construction.
To formulate building standards of green construction and carry out green eco-city construction demonstration. By 2020, the proportion of green building area to new construction area should be increased to 50% in urban area.
To launch the development plan of green building industry chain, promote green construction methods and energy-saving building materials, prefabricated and steel structure building.
To strengthen energy-saving renovation on existing residential building, more than 500 million square meters of transformation area will be covered and the basic energy-saving transformation of the available urban residential buildings in the northern heating areas should be completed by 2020.
Contact Us
+86-24-85718940
ShenYang LiaoNing China
Contact Us
Productivity